We had succesfully completed the erection of electro and bag filters, steel structure installation for the preheater stack, syclon installation, fabrication and installation of piping, ducts, chimney and chutes, installation of cement mills, coal and cooling plants construction, installation of belt and buckle conveyors and elevators, fabrication and installation of brulor beams, storage silos and otoclav in the below referred plants: 
-Akçimento Company Inc.
-Trakya Cement Industry Co., Inc.
-Anadolu Cement Industry Co., Inc.
-Yibitas Cement Industry Co., Inc.
-Nuh Cement Industry Co.,
-Aslan Cement Industry Co., 
-Set-Ankara Çimento Factory Inc.
-Türk Ytong Industry Inc.
-Magnesit Company Inc.
-Öztüre Limestone Industry and Trading Company Inc.

 
 We had succesfully comleted the fabrication and installation of piping, mechanical equipment erection, construction of Clean Room, installation of HVAC works and partitions, ampoule cleaning and filling station installation works for the SIFAR Medicine Industry and Trading Co.,Inc., Atabay Chemical and Medicine Industry Co., Inc., ADEKA and TURK HOECHST Medicine Industry Co.,Inc. In the pharmaceutical industry...
 
 Installation of HVAC ductworks in MCC rooms for paper and cardboard factories, renewing the hydraulic baling press and packaging system of viscose pulp, waste water purification plants construction and fabrication and installation of gas chutes for the SEKA Dalaman Plant and Kombassan Paper Factory in the cellulose industry...
 
 Underground piping, civil works for the construction of 13 each transformer units in Paint, Varnish and Raw Material Producer and Seller Connected Business Buildings, drinking water piping, rain and waste water and natural gas piping works in Ayazaga Satellite Town, C type military buildings in Kahramanmaras and A type military buildings in Fenerbahçe, partition installation in West LB Europa Bank and City Bank completed in the civil industry...
 
 Waste heatand auxiliary boiler rewamp works, construction and mechanical installation of DAP/NPK plant dust holding/stopping system, renewing of exchangers bundles, rehabilitation of phosphoric acid plant, fabrication and installation of evaporator, gas scrubber, jetty crane and belt conveyor systems completed for BAGFAS Fertilizer Industries Co., Inc. and IGSAS Istanbul Fertilizer Industries Co., Inc.
 
 All welding manpower works for the 60000DWT capacity ships and fabrication and installation of partitions and piping in the 35000DWT capacity ships for the Turkish Shipyard Industry Company Inc...
 
 Rehabilitation of acid pipelines, construction of IR-UT unit, fabrication and installation of mechanical works for the 2. Metallurgical Station for the Eregli and Iskenderun Iron Industry Companies in mining process...
 
 Mechanical works of sulphur recovery units, hot-tap and cold-cut tie-in operations, column and reactor rehabilitation and tray installation, exchanger maintenance works for the refineries Anadolu Tasfiyehanesi Company Ltd.(ATAS) and Artificial and Synthetic Fibre Industry Company Inc.
 
 Fabrication and installation of the fuel oil plant for the BODRUM-MILAS International Airport...
 
 Steel sturucture fabrication and installation for AMBARLI Combined Cycle Power Plant...
 
 Sylindirical storage tank fabrication and installation for the PHILSA Cigar factory...
 
 5000 m3 capacity spherical LPG tanks erection for IPRAGAZ and MILANGAZ Companies...
 
 Construction of waste water treatment plant for TORBALI REYNOLS Cigar factory...
 
 Fabrication of TAG Highway viaducts steel structure works for Tekfen Construction and Installation Company...
 
 BAKU-SUPSA Early Pipeline Project’s pump stations (3 each) detail engineering and all mechanical construction works...
 
 Steam trace piping in UZBEKHSTAN Fergana Refinery...
 
 Fabrication of drinking water purification plant for the SAMARA worksite of Tekfen Construction and Installation Company ...
 
 Fabrication of drinking water purification plant for BAGHDAT Consulate...
 
 Steel structure roof erection of the ISTANBUL Olympic Stadium...
 
 All mechanical works for the rehabilitation of Tengiz Pumpstation, construction of new Atyrau Pumpstation and related pig station, fabrication and installation of the steel structures for the valve stations in the CPC-K Pipeline Project in Kazakhstan-Tengiz/Atyrau  

 Consulting, materials procurement & expediting and installation works for Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project Pump Stations PT1, PT2 and IPT1 Pigging Station between...
 
 BP Operating "Compressor Water Injection, CA-CWP" Offshore Platform hot, cold and personal protection insulation material supply, detail engineering, application and supervision works, Azerbaijan-Baku 

 Consulting, project management and supervision works for Nurol Gulf LLC for the Project of Al Shaqab Academy for Qatar Foundation ARENA Structure, Qatar-Doha 
 
 Tender Preparation works for Nurol Gulf LLC for the Project of Manifa Development Project and Sabic Safco Amonia Plant Revamp Works in Kingdom of Saudi Arabia 

 


ODAK is giving service in every stage of the industrial plants construction.  

ODAK Construction and Installation Co., Ltd.
Turapoglu Sokak Sumko Sitesi A4 Blok D:14
Kozyatagi 34736 Istanbul TURKEY
TEL: +90 216 384 2733 pbx 
FAX:+90 216 384 2529